Early Access factory manual
Find The NeedleWiki & Guide
Follow the hay. Fix the bottleneck. Keep every needle on the route.
Practical factory routes, clear connections, and a searchable systems reference.
Updated 2026-11-17 · Early Access • V16.4 rules

Something stopped?
Missing needles? →Choose your next job
Factory guides
Start & progress
5 guides01First Factory LayoutPlace scrap sorting before hay processing, scan after packaging, then branch to the stand and Depot. Leave a service aisle and the next wall clear.02Delivery OrdersOpen the order sheet by Dispatch, follow WANTS, load matching goods and check progress. Orders pay as you load, with the 25% bonus per delivery.03Production StagesFollow five stages and 16 orders. Match each stage to its closing customer, current machine unlocks and the production chain your next order needs.04Tech TreeFind a card through a machine’s UPGRADE tab or the Tech Tree. Pin a goal, read its levels and bill, then buy the needed upgrade.05Demo vs Full GameDemo saves do not carry into the full game. Compare the opening loop with Early Access’s five stages, 16 orders and expanded factory systems.
Production & money
5 guides06Sell Hay & MoneyFeed the Selling Stand, read each product’s current price and buyer limit, then split output between sales, orders and materials you need.07Rake AimingUse the Rake’s LANDS ring and throw-distance control, check power and belt space, then move the machine and verify where its hay lands.08Splitters & RoutesUse a splitter to branch, a joiner to merge, and Smart Splitter rules for item sorting. Name routes to switch destinations without rebuilding belts.09Scrap & SmelterPress E on each marked jammed machine, then remove metal before hay processing. Feed a Smelter two iron or two copper scrap per ingot.10Depot & DronesScan before the Depot, set each item to keep or pass, and allow drones to take order stock. Add an outfeed for overflow; use Shelf Limits for caps.
Build & repair
5 guides11Building ControlsUse B to build, H and arrows to nudge a held preview, and Ctrl+C/V for machine settings. Read mode prompts before using R, X or Ctrl+Z.12Power Not WorkingOpen POWER on a pole or generator, show the line, then fix connection, fuel or capacity. Set essential machines to FIRST before expanding.13Water & PumpsA well reaches 10 m. Insert Pipe Pump Mk.1 for 20 m more head or Mk.2 for 50 m, then use E at a sight glass to inspect pressure and flow.14Vertical TransportSnap a Hay Lift to a wall belt port or belt end in the air. Check its direction, upper outfeed and power, then follow a load between floors.15Dismantle & UndoUse Dismantle Mode to check the refund. Hold targets one piece; R selects the whole blueprint. Ctrl+Z restores the last 20 removals.
Find needles
2 guides16Scanner RoutingScan after the last packaging machine and before a split to the stand, Depot or truck. Separate this from source-side scrap removal.17All 24 NeedlesEarly Access has 24 needles. Search exposed hay with the detector, scan finished products, and check drawers, machines and stored stock for missing finds.
Look it up
One systems reference.
The whole route in view.
Search 28 recorded machines, materials, and factory systems. Each entry gives the job it does and the guide that helps you use it.
Open the searchable wiki →